Skip to Content
 Prompt RFI Response
 Fast Submittal Turnaround
 Dedicated Project Contacts
 CSI MasterFormat Specs
 CAD/Revit Files Available
What We Provide

Built For the Way You Work

We speak your language — submittals, RFIs, bid leveling, and closeout packages. Here's exactly what's available to you.

Drawing & CAD Files

Current, revision-controlled drawings ready to load into your project model or print set. We maintain version history so you always know what's current.


 AutoCAD DWG Files (2018+)
 Revit RVT Families (LOD 300)
 PDF Plan Sets (Full & Half-Size)
 DXF for Compatibility
 Revision & Version Tracking

Bid & Spec Packages

Complete specification sections formatted to CSI MasterFormat — everything a GC or sub needs to bid accurately without a phone call.


 CSI MasterFormat Spec Sections
 Product Data & Cut Sheets
 Submittal Schedules
 Substitution Request Form
 Scope-of-Work Summaries

Project Communication

One point of contact, clear response windows, and a structured RFI process so nothing falls through the cracks on either side.


 Dedicated Project Manager
 Prompt RFI Response
 Formal Submittal Review
 Change Order Coordination
 Closeout Document Packages
How It Works

From Request to Delivered - Fast

A straightforward process with no ambiguity about who does what and when.


01

Submit Request

Fill out the project intake form below with your project details, document type, and deadline.

02

Confirmation

You'll receive a confirmation within 2 business hours with your assigned project contact and expected delivery date.

03

Delivery

Files and documents are delivered to your inbox or shared drive. Revisions and substitutions are handled through the same contact.

04

Open Channel

Your project manager stays available through construction for RFIs, submittals, and closeout needs.

Technical Details

File & Document Specifications

What you'll receive and the standards we work to.

CAD & BIM Files


  • AutoCAD Version 2018 DWG
  • Revit Version 2022 RVT
  • BIM Level of Detail LOD 300
  • Interchange Format
    DXF / IFC
  • Print-Ready PDF
    Full & Half Sheet
  • Revision Tracking
    Included

Spec & Bid Docs


  • Spec Format CSI MasterFormat
  • File Format PDF / DOCX
  • Cut Sheets PDF
  • Substitution Form
    PDF / Editable
  • Submittal Template
    Available
  • Closeout Package
    On Request
Get Documents

Request a Bid Package or Drawing Set

Fill out the form and your dedicated contact will follow up within 2 business hours.

Thank you for your submission!

Our team will message you back as soon as possible.


Urgent? Call Us Directly.

For bid deadlines, emergency substitution requests, or time-sensitive RFIs.

Phone

(303) 278 - 7790

Contractor Email

info@odpequipment.com

Hours

Mon-Fri, 9am-5pm

Common Questions

FAQ

Answers to the things contractors and architects ask us most.


Our Revit families are built to LOD 300 in Revit 2022 and are compatible with 2020 and newer. If you need an older version, contact us and we can export accordingly. All families include standard parameter sets for scheduling and tagging.

Standard bid packages are typically turned around within 1–2 business days. If you have an urgent bid deadline, note it in the form and call us directly — we can often accommodate same-day requests for partial packages.

Submit RFIs via email to your assigned project manager or to contractors@yourcompany.com. We target a response within 24 business hours. For complex RFIs requiring engineering input, we'll acknowledge receipt immediately and provide a timeline for the full response.

Yes. Use the substitution request form included in your bid package or download it from this page. Submit completed forms to your project manager at least 10 days before the bid date when possible. We review all substitutions and respond in writing.

Yes. All specification sections follow CSI MasterFormat 2016 standards and are formatted with three-part sections (General, Products, Execution). They are provided as both PDF and editable DOCX files so your team can incorporate them into the project manual.

Closeout packages typically include as-built drawings, O&M manuals, warranty documentation, final submittal log, and attic stock recommendations. Request your closeout package through your project manager at substantial completion.